Capital Improvements Program

Investing in water and wastewater infrastructure is investing in the community. Nearly 50% of customer rates fund the projects we undertake to improve infrastructure, and each year, we invest $15 to $60 million in capital improvements to increase OWASA’s system resiliency — upgrading pipes, pumps, equipment and much more. These projects form the basis of our 10-year Capital Improvements Program.

The Capital Improvements Program (CIP) manages the design and construction of all capital projects funded by OWASA. These include projects in all operational areas — from OWASA’s reservoirs to our reclaimed-water system. Our 10-year CIP is revised annually. In general, projects are funded and managed through the CIP if they are expected to cost more than $10,000 and if the installed equipment or materials have an expected lifespan of over five years.

We use a qualification-based selection process to procure engineering consulting services. We select contractors and consultants in compliance with all local, state and federal regulations. Bids may be solicited through an informal or formal process, depending upon the expected value of the work and based on our needs. We select the lowest responsive and responsible bid in all instances.

Capital Improvements Program for Fiscal Years 2026–2035

Invitation For Bids (IFBs), Request For Proposals (RFPs), and Request for Qualifications (RFQs)

Projects Under Construction

 

W. Rosemary Street Water Main Replacement:  Project page available, including details on progress, phases, and weekly updates.

 

Ridgefield-Briarcliff Water Main Replacement: Project page available, including project summary.

 

Honeysuckle Road Water Main Replacement:  Project construction launched July 6, 2026. The water main, which has reached the end of its useful life, will be replaced from Brookview Dr. to Foxwood Dr. with some work on Springview Trail. Work will be completed in two phases- from Brookview Drive to Booker Creek Trail (Phase 1) and from Booker Creek Trail to Foxwood Drive (Phase 2). This project is expected to take 6 to 8 months to complete. Single lane closures will be in place intermittently, but through traffic will be maintained. Residents will be notified if roadside parking or driveway may be blocked temporarily, and prior to any planned disruption in water service. This project will improve the reliability and resiliency of the infrastructure in the area.

 

Gravity Sewer Rehab and Cured-in-Place Pipe (CIPP) Lining: Beginning in September 2026, OWASA-contracted crews with Vision NC will begin work to rehabilitate wastewater collection systems in northeast Chapel Hill. This series of infrastructure projects across OWASA’s service area is expected to take eight months to complete. Weather or other unforeseen factors could impact the pace of this project.

 

In some areas, Vision NC crews will be repair sewer lines with cured in place pipe (CIPP) lining. Your sewer service connection will be temporarily sealed off when this work begins. We ask that you minimize flushing and washing to avoid a back-up of sewage into your home. Vision NC personnel will notify you 24-48 hours before this work begins.

 

What is CIPP Lining? 

CIPP Lining is a way to replace wastewater collection pipes without extensive excavating. It creates a seamless, structural new pipe inside an old, damaged one. A flexible fabric tube soaked in liquid epoxy resin is pulled or blown into the pipe, inflated, and hardened with heat or UV light.

 

How will installation of CIPP lining affect me and my home? 

In the few hours it will take to install, some residents may smell a chemical odor in their home. This odor is not harmful to breathe, but you can notify the crew on site if the odor affects you. Try opening windows and pouring  a cup of water into the drains in your home. This creates a seal to stop the odor from entering your home. If CIPP lining is being installed in your area, a Vision NC crew member will contact you before the process. You will be asked to limit flushing and showers until the process is complete– usually a total of six hours.

 

For matters relating to OWASA’s Capital Improvement Program, please email our Engineering Manager for Capital Projects, or call (919) 537-4251.

For matters relating to third-party projects, please email our Engineering Manager for Systems Development or call (919) 537-4244.

Information about third-party development projects — typically, water or wastewater lines constructed by others for eventual dedication to OWASA — is not provided on our website.